Let’s talk

Dwell Wild

Health Community Land

ThreshEarlier work of our team
Learn

Permits after the fact

What is a private provider, and why does Manatee County ask for one?

Published Nov 15, 2026 · 8 min read

A private provider, in Florida, is a licensed architect, engineer or building code administrator (the license a building official has) who you hire and pay to check your drawings for the building permit, inspect the work, or both, in place of the county (F.S. 553.791). On Thresh Architects' after-the-fact permits (permits for work already built) in Manatee County, in the flood zone or not, the required building inspections have still had to be done before the county's final approval, and the county hasn't done them itself, so a private provider has had to be on the permit. The law bars a provider from inspecting a building their own firm designed or built, so yours must come from a different firm than the one that drew or built your project.

Four steps from left to right: the owner hires the private provider, the provider inspects each stage of the framing it can see, signs under oath, and the county still issues the permit at its counter.

This post is for homes in unincorporated Manatee County (outside the limits of any city or town), where Manatee County Development Services issues the permit (Manatee County). If your home is inside the City of Bradenton, Palmetto, Holmes Beach, Anna Maria or Bradenton Beach, or the Town of Longboat Key, your city's or town's building department handles it (Bradenton, Palmetto, Holmes Beach, Anna Maria, Bradenton Beach, Longboat Key). A Bradenton or Palmetto mailing address doesn't settle it: on our jobs, homes with those addresses were outside city limits and permitted by the county. Check whether your lot is inside city limits.

A private provider does the county's checks, but the county still issues the permit

Florida law lets the fee owner, meaning the owner on the deed, choose a private provider to do the plan review (the check of the drawings against the building code), the required building inspections, or both, and pay the provider directly (F.S. 553.791). The county still issues the permit and, at the end, the certificate of occupancy or completion, its approval of the finished work.

The county checks its own rules, such as zoning (the rules for what may be built where on a lot) and the flood rules, because the law lets it review plans for "local ordinances, floodplain management regulations" and other matters apart from the building code (F.S. 553.791).

A home inspector a buyer hires does a different job. Florida law defines a home inspection as "a limited visual examination" of a home's parts for "a written professional opinion of the condition of the home" (F.S. 468.8311).

A private provider does the inspections your building permit requires, to the Florida Building Code, while the county issues the permit and checks its own rules, such as zoning and the flood rules.

A private provider must be licensed or certified by the state of Florida

Florida law defines a private provider as a person licensed as a building code administrator, an engineer or an architect (F.S. 553.791). A building code administrator, also called a building official, runs a building department's plan review and inspections (F.S. 468.603). A provider may inspect only within the trades (kinds of work, such as electrical or plumbing) their own license covers (F.S. 553.791).

On a home addition or alteration of 1,000 square feet or less, someone with the state's standard certificate as a building inspector may also do the inspections (not the plan review) (F.S. 553.791). That certificate takes years of building experience, sometimes with schooling or training, and a state board's exam on Florida's building laws and codes (F.S. 468.609).

Every provider must also register with the county before contracting to work there (F.S. 553.791).

A private provider must be a Florida-licensed architect, engineer or building code administrator, or, for inspections of a home addition or alteration up to 1,000 square feet, be a building inspector with the state's standard certificate.

On our Manatee County after-the-fact permits, a private provider has done the inspections

A permit's required inspections still have to be done before the county gives its final approval, and as I've seen it, Manatee County hasn't done them itself on after-the-fact work, so every after-the-fact permit we've done there has needed a private provider on it, flood zone or not. No county page, form or memo we found says the county doesn't inspect after-the-fact work, or why.

For homes in the high-risk flood zone on the federal flood maps (the Special Flood Hazard Area), the county's written policy says additions and alterations "will be reviewed and inspected entirely by the Manatee County Building Division" (Manatee County). In my experience the flood checks and the building inspections are two separate things: in a flood zone the county checks the flood rules itself, and on our after-the-fact work the building inspections have still gone to a private provider. Because the county's written policy says otherwise, and has no date, ask the county at the start who will inspect your work if your house is in the flood zone.

The flood zone adds the 50% rule. If the work costs half the building's value or more, not counting the land (Manatee County), the whole building "must be brought into compliance with flood damage prevention regulations" (Manatee County), a flood rule the county checks itself.

In my experience, Manatee County hasn't inspected after-the-fact work itself, so on our permits there, flood zone or not, a private provider has done the inspections.

The provider can't come from the firm that drew or built your project

A framed house under construction between two offices, the firm that drew its plans on one side and a private provider from a different firm on the other, with a line between them showing the law keeps them separate.

The firm that drew your plans or built the work can't be the one to inspect it, because Florida law says a provider "may not provide building code inspection services pursuant to this section upon any building designed or constructed by the private provider or the private provider's firm" (F.S. 553.791). So on jobs we draw, a second firm does the inspections, often an engineer we've worked with.

I'm a Florida-licensed architect, and Thresh Architects registered with Manatee County as a private provider firm at the end of 2025, so Thresh Architects can be that provider when another firm drew your plans. In 2026 we wrote a private provider proposal for a mobile home storage room and bathroom addition that an outside engineer drew.

The firm that drew your plans or built the work can't inspect it, so your private provider must come from a different firm.

Name the provider when you apply, or the job can stall

We name the private provider on the permit application from the start. Florida law lets you tell the county in writing with the application, or later, by 2 p.m., 2 business days before the first scheduled inspection, on the state's Notice to Building Official of Use of Private Provider (F.S. 553.791).

The county's checklist for the provider's packet (the set of forms the provider sends the county) asks for these, among others (Manatee County):

  • the Notice to Building Official, filled in and signed
  • the fee owner's written okay, when a contractor hires the provider
  • the provider's qualifications and certificate of insurance

On our jobs the private provider has supplied these forms, and the owner has filled in their part of the Notice and signed it.

Manatee's permit fee includes a charge for plan review and a charge for inspections. Under a temporary county memo, since July 1 2026, when a provider takes over one of those services the county takes 25 percent off that service's charge, and when the provider does both, it takes 50 percent off both (Manatee County). You pay the provider their own fee on top.

On one job the county approved the plans, but only "pending the private provider", so nothing moved until one was named. Another job, a different 2026 mobile home storage addition with a storm-damaged roof, which we drew, waited for months for a provider, because we don't send the application in until a provider can be named on it. I had offered to revise the drawings to an engineer's markups, and since a provider inspects the house against the drawings, I asked the owner to hire one before I made the changes. As I wrote, "The revised plans are only useful once someone is in place to inspect against them."

Name your private provider on the permit application, because the county can approve the plans and the job waits for one.

A provider inspects each stage the code requires, and only what they can see

A wood-frame wall in four stages, its sheathing, its window anchors checked in person or by video, its lath and weep screed, then the finished wall, each inspected before the next stage covers it.

A private provider must inspect "each phase of construction as required by the applicable codes," in person or by video (F.S. 553.791).

On a 2026 window, door, stucco and siding job that came from a code enforcement case (a county case with a deadline to fix a problem), the inspections I planned as provider were these:

  • wall sheathing (the layer of boards on the outside of the framing)
  • lath (the wire mesh stucco is spread over)
  • how each window and door is screwed and anchored to the wall
  • the building final (the last inspection, of the finished work)

A private provider can only pass work that's built the way the approved plans show it, so before taking that job on I compared the plans with the site photos and the code case and listed what had to be resolved before any inspection. One item read, "No photos submitted show a weep screed at the base of the stucco over wire lath." A weep screed is the metal strip at the bottom of a stucco wall that lets water out, and with no photo of one, I couldn't confirm it was there.

Our written terms say that where after-the-fact work is already covered, "inspections will be limited to visible and accessible elements," so part of a wall or ceiling may need opening, as our guide to the after-the-fact path explains.

Your provider inspects each stage of the work the code requires, and on finished work can certify only what they can see.

At the end, the provider signs under oath for the work they inspected, and answers to the state

When every inspection has passed, the provider prepares a certificate of compliance, stating under oath that the inspections were done and that, to the best of the provider's knowledge, the work inspected "complies with the approved plans and applicable codes" (F.S. 553.791). For a one- or two-family house, once the county has that certificate and the other approvals, and every fee is paid, the law gives it 2 business days to issue the certificate of occupancy or completion, or to say what's missing (F.S. 553.791).

Even though you pay the provider, the law lets the state board that licenses them discipline them, and lets the county check their inspections once it has written rules for doing so (F.S. 553.791).

At the end, the provider swears under oath that, to the best of their knowledge, the work they inspected meets the approved plans and the code, and answers to the state board that licenses them.

Sources

  1. Manatee County, "Apply, Search and Manage Building Permits"
  2. City of Bradenton, Building and Permitting Division
  3. City of Palmetto, Building Department
  4. City of Holmes Beach, Building Department
  5. City of Anna Maria, "Frequently Asked Questions"
  6. City of Bradenton Beach, Building & Planning
  7. Town of Longboat Key, Building Division
  8. Florida Statutes § 553.791, private providers
  9. Florida Statutes § 468.8311, home inspectors, definitions
  10. Florida Statutes § 468.603, building code administrators and inspectors, definitions
  11. Florida Statutes § 468.609, standard certificates
  12. Manatee County, "Private Provider Package Checklist w/ Statute References"
  13. Florida DBPR, License Search
  14. Manatee County, "Private Provider Program, Projects in a FEMA Special Flood Hazard Area"
  15. Manatee County, Flood information
  16. Manatee County, "Floodplain Post Storm Guidance" (Feb 12 2025)
  17. Manatee County, "Blank NTBO Document" (Notice to Building Official of Use of Private Provider)
  18. Manatee County Development Services, "Interim Permit Fee Reductions for Private Provider Services" (Jun 25 2026)