Permits after the fact
I fixed hurricane or fire damage without a permit in Manatee County. Can I still get one?

Yes. In Manatee County, Florida, you can still apply for an after-the-fact permit (a permit for work that's already finished) (Manatee County) for storm or fire repairs you've made, such as roofing, walls and carport replacement (Manatee County, Florida Building Code). On the storm repair jobs Thresh Architects has worked on there, owners who made the repair before applying got the permit afterward, with drawings of the repair as it stands, the county's plan review, then inspections, and anything that didn't meet the code had to be changed or opened up. In a flood zone, if the repair costs half or more of the building's value before the damage, the whole building must meet today's flood rules (Manatee County), and dated photos of the damage let you question the county's estimate (Manatee County).

This post is for homes in unincorporated Manatee County (outside the limits of any city or town), where Manatee County Development Services issues the permit (Manatee County). If your home is inside the City of Bradenton, Palmetto, Holmes Beach, Anna Maria or Bradenton Beach, or the Town of Longboat Key, your city's or town's building department handles it (Bradenton, Palmetto, Holmes Beach, Anna Maria, Bradenton Beach, Longboat Key). A Bradenton or Palmetto mailing address doesn't settle it: on our jobs, homes with those addresses were outside city limits and permitted by the county. Check whether your lot is inside city limits.
Storm and fire repairs need a permit in Manatee County, even when the work is done
Manatee County's 2026 post-storm permitting guide lists the repairs that need a permit after "a hurricane or other declared disaster" (Manatee County). Among them are roofing, walls whether or not they bear weight, drywall, the floor and roof framing, windows and doors, and replacing a carport. Minor repairs, such as replacing screens, painting and cleaning, don't need one.
Because the guide is for declared disasters, a house fire falls under the state code. Florida's building code requires a permit for any repair, fire repairs included, that cuts into walls or framing or touches the wiring (Florida Building Code). Ordinary minor repairs may skip the permit with the approval of the building official, the head of the county's building department (Florida Building Code).
The code lets repairs that "must be performed in an emergency situation" start before the permit, with the application to the building official "within the next working business day" (Florida Building Code). A repair finished weeks or months before anyone applied missed that next-business-day window, so it needs an after-the-fact permit.
A storm repair to a roof or wall, or a replaced carport, needs a permit, and so does a fire repair to walls, framing or wiring.
A repair made before the permit is drawn as it was built

In 2026 we drew a carport repaired after a hurricane, its posts replaced with larger aluminum ones. The drawings showed the carport as it stood, and how each new post was bolted to the beam and anchored to the slab.
The rest follows our guide to after-the-fact permits. The drawings are sealed (signed and stamped by a licensed Florida architect or engineer), the county's reviewers check them against the code, and inspections come last. In our experience, Manatee County doesn't inspect after-the-fact work itself, so a private provider, an inspector the owner hires, has to be named on the permit (in a flood zone, the county may inspect instead; see below).
On our jobs, the permit came after the repair, with drawings of the work as it stands, then plan review and inspections by a private provider.
If code enforcement found the repair, its deadline can come before the permit
A code enforcement notice sets a deadline to correct the problem (Manatee County), but the permit comes from a different county office, Development Services (Manatee County), and that deadline keeps running while the drawings are made and reviewed, so it can pass before the permit is issued (our guide). If it passes, the case can go to the Special Magistrate (a hearing officer who decides code cases), and a home may then be fined $50 a day until the violation is corrected (Manatee County).
On a 2024 storm repair to a mobile home, the owner had first patched the damage with fiberglass sheets and stucco, and told us the county then asked for drawings. On that job we asked the code enforcement officer to put off the penalties and court dates while we worked, showed that the permit was under way, and the officer extended the deadline.
That job's damage came before Hurricane Milton, but when the county reviewed it later in 2024, its permit website said staff had been moved to storm duties after Milton and its services would be affected. After a big storm, review can take longer, so a code deadline is even more likely to come first.
If you need more time, ask the officer named on your notice, and show that the permit is under way. The county doesn't have to agree.
If a code case is open, start the permit application before its deadline.
A roof replaced without a permit may need its product approval number, and an older roof may need all its covering redone
Manatee County's standard roof permit asks for the Florida product approval, the state's approval number for the roofing product (Manatee County). For a roof already on, that means finding out what was installed.
If more than a quarter of a roof, or of one roof section, is repaired or replaced within 12 months, the covering on that whole roof or section (the shingles, tile or metal on top) must be redone to today's code, unless that roof or section was last built or redone to the 2007 Florida Building Code or later (Florida Building Code, Existing Building, F.S. 553.844). A mobile home's repairs follow Florida's rule for mobile homes (Fla. Admin. Code 15C-2.0081), which our post on mobile homes explains.
The layers under the covering can't be seen by an inspector on a finished roof, so part of the roof covering may need to come up before the private provider can certify it.
In 2026 a homeowner whose roof blew off in a hurricane asked us for after-the-fact drawings. Our proposal listed drawings of the house as it stands, a roof plan, a floor plan and each outside wall, with the truss maker to provide the truss layout (the triangle frames that support the roof).
Manatee County's standard roof permit asks for the approval number of the roofing that went on, and an older roof (before the 2007 code) with more than a quarter redone in a year needs all its covering brought to today's code.
A fire repair can put back what was damaged, and the inspector has to see it

Florida's code for existing buildings lets damaged parts be restored to how they were before the damage (Florida Building Code, Existing Building). On one 2026 fire repair to an earlier addition at a mobile home, an outside engineer's plans covered replacing the damaged studs (the upright boards in a wall's frame) and sheathing (the boards over the frame), the insulation and the electrical work. Serious damage to the structure means an evaluation by a licensed architect or engineer first (Florida Building Code, Existing Building).
The private provider has to certify under oath that, to the best of their knowledge, the work inspected "complies with the approved plans and applicable codes" (F.S. 553.791). Our private provider terms say that on after-the-fact work already covered up, inspections are "limited to visible and accessible elements." New studs and wires behind finished walls can't be seen, so part of a wall or ceiling may need to be opened.
On a finished fire repair, part of a wall may need opening.
Repairs costing half the building's value or more in a flood zone bring in today's flood rules
If your home is in a flood zone (look up your zone on the county's flood page), Manatee County reviews its repairs for substantial damage, damage "of any origin," so a fire counts as well as a storm (Manatee County). If restoring the building would cost half or more of its market value before the damage, it "must be brought into compliance with flood damage prevention regulations, including elevating the building," that is, raising it (Manatee County). This is what the county calls the 50% Rule (Manatee County).
From what I've seen, an older house usually can't meet today's flood code, so it may have to be torn down. To decide the building's value for the 50% Rule, the county uses its tax-assessed value, not counting the land, and accepts a private appraisal (a report on what the building is worth) in its place (Manatee County). A higher building value makes the cost of the work a smaller share of it, so on flood-zone work we often try to keep the two balanced right, meaning the cost stays under half. Our post on mobile homes explains when an appraisal helps.
The flood review and the building inspections are two separate things, and in my experience after-the-fact work in Manatee County has gone to a private provider, flood zone or not. The county's written policy says otherwise for flood zones, where it reviews and inspects alterations and additions to homes itself (Manatee County), so ask the county at the start who will inspect.
In a flood zone, a repair costing half the building's value or more brings the whole building under today's flood rules.
Dated photos of the damage help with fee waivers and, in a flood zone, the county's damage estimate
Manatee County's advice after a storm is to "take photographs of all building damage and damaged contents" (Manatee County). In a flood zone, the county estimates the damage to decide whether the 50% Rule applies. If you think its estimate is wrong, it accepts photos "with date stamp immediately after the storm" that show how much was or wasn't damaged (Manatee County). If you get a private appraisal to show the building was worth more, it must include photos of the home before the damage (Manatee County).
After a declared disaster, the county may cut or waive fees for some storm repair permits, such as a roof, and it requires photos of the damage to request a waiver (Manatee County). The fee waivers after the 2024 storms have ended (Manatee County). On our after-the-fact jobs, the county has charged double the permit fee every time (Manatee County).
Photograph all the damage, with the date, before you fix it.
Sources
- Manatee County, "Apply, Search and Manage Building Permits"
- City of Bradenton, Building and Permitting Division
- City of Palmetto, Building Department
- City of Holmes Beach, Building Department
- City of Anna Maria, "Frequently Asked Questions"
- City of Bradenton Beach, Building & Planning
- Town of Longboat Key, Building Division
- Manatee County Development Services, "Post-Storm Permitting Plan" (2026)
- Manatee County, "Building in the Floodplain" (Feb 12 2025)
- Manatee County, "Floodplain Post Storm Guidance" (Feb 12 2025)
- Florida Building Code, Building 2023, Chapter 1 (105.1, 105.2.1, 105.2.2)
- Manatee County Code Enforcement, "Code Enforcement Case Process" (Jul 29 2025)
- Manatee County, Building Fee Schedule
- Manatee County, Permitting Section
- Florida Building Code, Existing Building 2023, Section 706, Reroofing
- Florida Statutes § 553.844, roofs
- Florida Building Code, Existing Building 2023, Chapter 4, Repairs
- Florida Administrative Code 15C-2.0081, Mobile/Manufactured Home Repair and Remodeling Code
- Florida Statutes § 553.791, private providers
- Manatee County, "Private Provider Program, Projects in a FEMA Special Flood Hazard Area"
- Manatee County, Flood information
- Manatee County, "Manatee County Continues Assessment and Rebuilding" (Oct 31 2024)
Let’s talk